Press Statement by Raveentharan ADUN Batu Uban on the Flash Flood and Landslide near Bukit Gambir Date: 19 October 2011 The approval of plan by the previous regime is very much suspicious because the developer can build a 3 feet wall and divert the river flow into a drain. This is tantamount to going against nature. After 40 minutes of downpour, a beautiful but life threatening waterfall appears from nowhere and this has also caused erosion of the rocks and soil. I think the only solution to arrest this problem is to provide several catchment areas and to build retention ponds at the top of Bukit Gambir. I have already proposed and expressed to the Dewan Undangan Negeri the need to turn this area into an ecopark to preserve the environment as a water catchment area and to build mini reservoir to stop the sudden flash floods. This will also help alleviate the flash flood problems at Jalan Satu and Jalan Enam at Changkat Minden and Sungai Dua area. I feel very sorry and sympat...
Stories and more...